One component, closed cell, hydrophobic, water reactive, phthalate free, low viscosity polyurethane injection resin for stabilisation and water cut-off of large water leaks.
In contact with water the SPETEC® SEAL F400 will expand and set as a permanent flexible water seal inside the crack or joint.
Note : the following is a typical application description. In case of other jobsite parameters, please contact our technical department.
For leaking joints, check how the joint runs into the construction.
Injection holes have to be drilled into the joint.
For leaking cracks, drill the injection holes in a zig-zag pattern around the crack to make sure that the injection hole intersects with the crack.
Drill and drill bits of appropriate diameter and length Packers of appropriate diameter and length Injection pump; manual, pneumatic or electric.
Drill under an angle of 45° into the crack or joint. Ideally the injection hole should intersect the joint or crack about half way the thickness of the wall or slab.
Blow the dust out of the injection hole.
Fix a packer of the right diameter into the injection hole.
Read the technical and safety data sheets prior to commencement of the injection works.
Vigorously shake the SPETEC® Gen Acc or the SPETEC® Gen Acc Fast before use. Pour the required amount (2-10%) into the SPETEC® SEAL F400 resin.
Mix the accelerator homogeneously into the resin and protect against moisture and rain to prevent premature reaction. Only prepare that amount of product that can be processed in one day.
Depending on the application, injection can be carried out using a hand pump, pneumatic pump or electric pump.
Always use a separate pump for injection of water and PUR resin.
Check that the pump is working properly.
Prior to injection, the pump must be flushed with SPETEC® PUMP CLEANER and be completely free of water to prevent pump blockage.
Start the injection at the first packer; for vertical joints or cracks this is usually the lowest packer.
Do not over pressurise while injecting; the correct injection pressure is the pressure that allows to resin to flow into the crack or joint.
Avoid injecting at pressures of more than 100 bars. If unreacted resin comes out of the joint or crack, stop the injection and move on to the next packer.
After the last injection of resin into the packer, shoot a little bit of water into the packer in order to make sure that the last injected resin will react as well.
After injection, remove the packers from the concrete and fill the holes with a fast setting cement or any other appropriate filler material.
Avoid injecting by temperatures below -20°C. In extreme cold conditions it is recommended to warm the resin and catalyst.
After the injection, clean the pump with SPETEC® PUMP CLEANER. If the pump will not be used for several days, put oil into the pump and leave it there until the next usage. Never rinse the pump with water.
SPETEC® PUMP CLEANER
SPETEC® PACKERS & ACCESSORIES CERMIPLUG
Water must always be present during the injection of SPETEC® SEAL F400 as it is a water-reactive resin.
SPETEC® SEAL F400, uncured (Appearance: white liquid) | ||
Viscosity at 25°C | Brookfield SP4 – 200 rpm
|
+ 350 mPa.s
|
Density | EN ISO 2811-1
|
+ 1,06 kg/dm3
|
SPETEC® Gen Acc, Accelerator for SPETEC® SEAL F400 (Appearance: yellow – orange liquid)
|
||
Viscosity at 25°C | Brookfield SP3 / 200 rpm
|
± 75 mPa.s
|
Flash point | 156°C.
|
|
Density | EN ISO 2811-1
|
± 1,05 kg/dm3
|
SPETEC® Gen Acc Fast, Accelerator voor SPETEC®SEAL F400 (Appearance: yellow – orange liquid) | ||
Viscosity at 25°C | Brookfield SP3 / 200 rpm
|
± 70 mPa.s
|
Flash point
|
156°C.
|
|
Density | EN ISO 2811-1
|
± 1,05 kg/dm3
|
SPETEC® Gen Acc
|
5°C | 15°C | 25°C | ||||||
% | Start | End | End | End | |||||
2 | 110” | 265” | 8V | 70” | 215” | 8V | 45” | 145” | 8V |
6 | 45” | 115” | 10V | 31” | 81” | 10V | 25” | 58” | 10V |
10 | 35” | 80” | 11V | 21” | 60” | 11V | 15” | 40” | 11V |
SPETEC® Gen Acc Fast | 5°C | 15°C | 25°C | ||||||
% | Start | End | Start | End | Start | End | |||
2 | 70” | 180” | 9V | 40” | 120” | 9V | 30” | 95” | 9V |
6 | 30” | 75” | 10V | 20” | 55” | 10V | 15” | 45” | 10V |
10 | 17” | 50” | 11V | 15” | 40” | 11V | 10” | 30” | 11V |
Consumption has to be assessed on site and is influenced by the amount of water leaking, thickness of the concrete slab or wall, presence of voids in and around the concrete etc.
Cured polyurethane exhibits good chemical resistance, is harmless for the environment and resistant to biological attack. (contact our Technical Service for more information)
SPETEC® SEAL F400 | 5 kg | Metal cans | 92 cans/pallet |
20 kg | Pails | 24 pails/pallet | |
200 kg | Steel drums | 4 drums/pallet | |
SPETEC® Gen Acc | 0,5 kg | Plastic Bottles | 12 bottles/box
40 boxes/pallet |
2 kg | Plastic Bottles | 4 bottles/box
44 boxes/pallet |
|
20 kg | Pails | 24 pails/pallet | |
SPETEC® Gen Acc Fast | 2 kg | Plastic Bottles | 4 bottles/box
44 boxes/pallet |
SPETEC® SEAL F400 is moisture sensitive and should be stored in a dry area between +5°C and +30°C. Shelf life of the resin: 24 months in original packaging. Shelf life of the accelerator: 24 months in original packaging Once opened, containers should be used as soon as possible.
Avoid contact with eyes and skin, always use personal protective equipment in compliance with local regulations. Read the relevant Material Safety Data Sheet before use. Material Safety Data Sheets are available on www.spetec.com When in doubt contact SPETEC® Technical Service.